American access system ADV-1000 Betriebsanweisung Seite 163

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 777
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 162
163
5 Select the Record View Visible check box to
see the required check points for the tour chosen.
Sequenced and unsequenced check points are
listed on separate tabs.
As the tour progresses, the main Guard Tour
window reports the tour progress, indicating each
check point as it is validated, along with the time
between check points, and the total time elapsed.
If a point is missed, it changes to red in the list
and an alarm is displayed in the Alarm view.
NOTE: To pause the tour, click the Pause button.
Late or missed check point alarms are not generated
while a tour is paused. To restart the tour, click
Pause again.
User Overview
Seitenansicht 162
1 2 ... 158 159 160 161 162 163 164 165 166 167 168 ... 776 777

Kommentare zu diesen Handbüchern

Keine Kommentare